Webster Truck Launceston – 5-Tonne Crane Replacement & Runway Assessment

Client: Webster Truck Launceston
Location: Launceston, Tasmania
Project Type: Crane Replacement Engineering, Runway Beam Assessment & Structural Verification
Year Completed: 2026

Services Provided

Structural assessment for replacement of existing 5-tonne crane

Verification of 18-metre crane span and 45-metre runway system

Development of crane wheel loads

Runway beam and support structure checks

Compliance assessment to AS 1418, AS 4100 & AS/NZS 1170

Outcome


Delivered a compliant, safe and installation-ready engineering package enabling the client to upgrade their lifting system with confidence.

Project Overview

Webster Truck Launceston engaged EPC Tech to provide engineering verification for the replacement of an ageing 5-tonne overhead travelling crane. The new crane featured an 18-metre span operating along a 45-metre runway supported by existing structural steelwork.

The project required detailed structural assessment of the existing runway beams and supporting frames to confirm they could safely accommodate the upgraded crane loads without requiring costly strengthening works or operational downtime.

The client required a practical and efficient engineering solution supported by clear compliance documentation suitable for installation approval and future audit requirements.

Scope of Works

EPC Tech delivered a complete structural engineering package including:

  • Calculation and development of crane wheel loads
  • Structural assessment of runway beams and supporting frames
  • Verification of deflection and serviceability performance
  • Strength checks for bending, shear and structural stability
  • Review of existing structural conditions and load paths
  • Compliance verification to AS 1418, AS 4100 and AS/NZS 1170
  • Preparation of engineering calculations and compliance documentation

Technical Approach

01

Load Development

  • Crane capacity: 5 tonnes
  • Crane span: 18 metres
  • Runway length: 45 metres
  • Wheel configuration: 2 wheels per end carriage
  • Load combinations developed in accordance with AS/NZS 1170 and AS 1418

02

Structural Modelling

  • Analysis of runway beams under moving wheel loads
  • Assessment of dynamic loading factors for crane duty classification
  • Verification of supporting frames for vertical, lateral and longitudinal loading action

03

Design Verification

  • Bending capacity checks
  • Shear capacity checks
  • Deflection verification for crane operation
  • Lateral stability and torsional checks

04

Documentation

  • Clause-referenced engineering calculations
  • Load diagrams and structural summaries
  • Report-ready outputs suitable for certification and audit purposes

05

Project Challenges

  • Limited documentation available for the existing runway beam system
  • Long runway length introducing cumulative deflection and alignment considerations
  • Verification of compatibility between new crane loads and existing structural steelwork
  • Requirement to minimise operational disruption during assessment works

Engineering Outcomes

  • Developed accurate wheel loads for the replacement 5-tonne crane
  • Verified that the existing runway beams were structurally adequate for the upgraded crane system
  • Confirmed deflection performance within acceptable operational limits
  • Identified that no strengthening works were required, reducing project cost and downtime
  • Provided clear recommendations for crane installation and future inspection requirements

Final Deliverables

The client received a complete engineering package including:

  • Full structural calculation report
  • Compliance statement referencing AS 1418, AS 4100 and AS/NZS 1170
  • Marked-up drawings and load diagrams
  • Recommendations for installation and ongoing maintenance

Project Outcome

The engineering assessment enabled Webster Truck Launceston to confidently replace their existing crane system with a modern 5-tonne overhead crane while maintaining the integrity of the existing runway structure.

EPC Tech delivered a compliant and practical engineering solution that improved operational safety and reliability while avoiding unnecessary strengthening works, reducing installation downtime and providing clear documentation for future compliance and audit requirements.

Book Your Free
Consultation

Get a Free Consultation with our senior engineers to discuss your project goals. We’ll outline how EPC Tech delivers compliant, buildable designs, on time, on budget, and ready for success.

EPC Tech
Trusted by Companies

EPC Tech Capability Statement (General)